Environment and Energy

INSTALLATION FOR SIMULTANEOUS PRODUCTION OF ELECTRICAL POWER AND HEAT FROM BIOGAS AT THE DOMŽALE – KAMNIK CENTRAL WASTEWATER TREATMENT PLANT

Supply, assembly, installation, start and test operation of the biogas cogeneration plant with nominal electrical power of 200 kW
Client/investor: The Municipalities of Domžale, Kamnik, Mengeš, Cerklje na Gorenjskem, Komenda, Trzin
User: JP CČN Domžale - Kamnik d.o.o. (Public Company Central Wastewater Treatment Plant)
Department: Environment and Energy
Period: 2017
Environment and Energy

INSTALLATION FOR SIMULTANEOUS PRODUCTION OF ELECTRICAL POWER AND HEAT FROM BIOGAS AT THE DOMŽALE – KAMNIK CENTRAL WASTEWATER TREATMENT PLANT

Supply, assembly, installation, start and test operation of the biogas cogeneration plant with nominal electrical power of 200 kW
Client/investor: The Municipalities of Domžale, Kamnik, Mengeš, Cerklje na Gorenjskem, Komenda, Trzin
User: JP CČN Domžale - Kamnik d.o.o. (Public Company Central Wastewater Treatment Plant)
Department: Environment and Energy
Period: 2017

More projects by GH HOLDING

BLC Schenker Maribor

Business facility of A1-Turboinštitut

Sports Hall adjacent to the Primary School at Dobrova

Hotel&Casino Resort Admiral