POMURJE REGIONAL WASTE MANAGEMENT CENTRE – PHASE II

The planning, design and management of the project to construct phase II of the Centre for Waste Management includes the structure for mechanical and biological processing (MBP) of mixed municipal waste (MMW), closed composting separately collected biological waste (SBW), production of solid fuel from non-hazardous waste, and disposal of processed waste residue at the enlarged landfill stage 2 phase II.
The planning, design and construction of a MBR plant (biological purification using ultrafiltration and reverse osmosis) for the treatment of landfill leachate with the capacity of 120 m3/day.
The planning, design and construction of the system for the admittance and purification of waste air from MBP structures with the capacity of 30,000 m3/h.
Short introduction: capacity of the Waste Management Centre: 50,000 t/year of municipal waste
Capacity of the MBR plant: 120m3/d
Capacity of the system for the admittance and purification of waste air: 30.000m3/h Client/investor: Municipality of Puconci
User: Javno podjetje Center za ravnanje z odpadki Puconci d.o.o. (Public Company for Waste Management of Puconci)
Department: Environment and Energy
Period: 2011-2014
Environment and Energy

POMURJE REGIONAL WASTE MANAGEMENT CENTRE – PHASE II

The planning, design and management of the project to construct phase II of the Centre for Waste Management includes the structure for mechanical and biological processing (MBP) of mixed municipal waste (MMW), closed composting separately collected biological waste (SBW), production of solid fuel from non-hazardous waste, and disposal of processed waste residue at the enlarged landfill stage 2 phase II.
The planning, design and construction of a MBR plant (biological purification using ultrafiltration and reverse osmosis) for the treatment of landfill leachate with the capacity of 120 m3/day.
The planning, design and construction of the system for the admittance and purification of waste air from MBP structures with the capacity of 30,000 m3/h.
Short introduction: capacity of the Waste Management Centre: 50,000 t/year of municipal waste
Capacity of the MBR plant: 120m3/d
Capacity of the system for the admittance and purification of waste air: 30.000m3/h Client/investor: Municipality of Puconci
User: Javno podjetje Center za ravnanje z odpadki Puconci d.o.o. (Public Company for Waste Management of Puconci)
Department: Environment and Energy
Period: 2011-2014