Construction Engineering
INTERIOR RECONTRUCTION OF THE CITYPARK SHOPPING CENTRE
We have begun the reconstruction of the interior of the shopping centre in order to place new stores within the existing dimensions of the structure. The reconstruction due to the placement of new tenants also entails the establishment of a new communications core at the mall and the remodelling of its interior facades that at the same time constitutes the entrance portal to the outer rim shops. The planned reconstruction will also rearrange the servicing and technical facilities on all floors that are required both for the operation of the existing stores/catering facilities and for the new tenants.
Client/investor: EUROMARKT d.o.o.
User: CITYPARK Ljubljana
Department: Construction Engineering
Period: JANUARY 2018
User: CITYPARK Ljubljana
Department: Construction Engineering
Period: JANUARY 2018